[1]
Asep Rahmat Ramdani et al. 2025. Schedule Performance Evaluation Using S-Curve Analysis: A Case Study of a Settlement Infrastructure Project. International Journal of Global Optimization and Its Application. 4, 4 (Dec. 2025), e539. DOI:https://doi.org/10.56225/ijgoia.v4i4.539.